• About us
  • Privacy Policy
  • Contact us
Neo Science Hub
ADVERTISEMENT
  • Home
  • e-Mag Archives
  • e-Learning
  • Categories
    • Healthcare & Medicine
    • Pharmaceutical & Chemical
    • Automobiles
    • Blogs
      • Anil Trigunayat
      • BOOKmarked
      • Chadha’s Corner
      • Cyber Gyan
      • Raul Over
      • Taste of Tradition
        • Dr. G. V. Purnachand
      • Vantage
    • Business Hub
    • Engineering
    • Innovations
    • Life Sciences
    • Space Technology
  • PhotoSynthesis
  • Subscribe Now
  • Contact us
  • Log In
No Result
View All Result
  • Home
  • e-Mag Archives
  • e-Learning
  • Categories
    • Healthcare & Medicine
    • Pharmaceutical & Chemical
    • Automobiles
    • Blogs
      • Anil Trigunayat
      • BOOKmarked
      • Chadha’s Corner
      • Cyber Gyan
      • Raul Over
      • Taste of Tradition
        • Dr. G. V. Purnachand
      • Vantage
    • Business Hub
    • Engineering
    • Innovations
    • Life Sciences
    • Space Technology
  • PhotoSynthesis
  • Subscribe Now
  • Contact us
  • Log In
No Result
View All Result
Neo Science Hub
No Result
View All Result
  • Home
  • e-Mag Archives
  • e-Learning
  • Categories
  • PhotoSynthesis
  • Subscribe Now
  • Contact us
  • Log In

26 August: Reconstructing the Langtang Lirung Collapse

Rashmi NSH by Rashmi NSH
1 month ago
in Science News
0
Descent Langtang Lirung | Neo Science Hub

In less than an hour a slab of rock and ice fell more than a kilometre, became a debris flood and reached hydropower tunnels and border towns in Nepal and Tibet. Early reconstructions agree on the sequence and disagree on many of the numbers.

At 08:37 Nepal time on 26 August 2026, seismometers around the world registered a signal from the Langtang Himal, close to the border between Nepal and Tibet. It was first read as a small earthquake. It was not. The United States Geological Survey concluded that the signal came from a landslide, and early reports put its seismic magnitude at 5.2; the international analysis led by Imperial College London puts the energy released on impact at the equivalent of a magnitude 5.5 earthquake. Within minutes the mountain’s debris had become a flood.

The source

The failure began on the north face of Langtang Lirung, a 7,227-metre peak. ICIMOD describes it as bedrock failure that took the glacier with it, rather than a glacier collapsing on its own. The Imperial-led analysis places the fall between roughly 5,150 and 3,750 metres, a drop of 1,400 metres; ICIMOD gives about 1,200 metres from a source zone at 5,000 to 5,500 metres. Debris ran some 400 metres up the valley walls near the source. The mass fell into the Lhende Khola, a steep valley that drains to the Trishuli River. Satellite observations described unusually warm conditions around the glacier beforehand, with diminished snow cover exposing bare ice, according to Al Jazeera’s account of the early imagery.

Why the seismometers noticed

Large landslides radiate seismic waves much as small earthquakes do, which is how a slope failure in the Langtang Himal was recorded worldwide. The first magnitude estimate was made by earthquake-detection routines and was later revised when analysts recognised the character of the signal. This is both an opportunity and a limit for warning: seismic networks can show within minutes that something large has happened, but not what it is or where the water will go.

How an avalanche becomes a flood

A rock-ice avalanche is a fast mixture of fractured rock and ice. As it descends it grinds and heats the ice, entrains sediment and water from the valley floor, and pushes river water ahead of it. The analysis identifies several sources of water in this event: ice melted by friction, buried glacier ice struck by the debris, permafrost water released from the rock, and displaced river water. The resulting mixture behaves like wet concrete, capable of carrying boulders, and it turns into a debris flood as it thins with distance and gains water.

ICIMOD adds that the debris may have temporarily dammed the Lhende Khola, in which case part of the surge was a landslide-dam outburst, a different process from the glacial lake outburst floods that dominate hazard mapping. Reports in the following days also described two barrier lakes forming behind debris, creating a secondary flood threat.

The first minutes and the reach

The flood struck the Rasuwagadhi border crossing at about 08:40, three minutes after the collapse, according to ICIMOD. Farther downstream at Galchhi the Trishuli rose nine metres in 30 minutes. The Imperial-led analysis estimates that roughly 20 million cubic metres of excess water passed Devghat, on the lower Trishuli, in under four hours, and that about 30.5 million cubic metres of sediment was deposited along the way.

Accounts differ on how far the destructive flood ran. ICIMOD describes nearly 100 kilometres downstream; the Imperial-led analysis reconstructs about 200 kilometres in under seven hours. The two may be measuring different things, such as the reach of severe damage versus the reach of a detectable rise, and the definitions have not been reconciled publicly. Estimates of the initial volume of the collapse also vary widely between early accounts and should be treated as provisional.

Infrastructure and people

The valley is a corridor for roads, bridges and hydropower. Several plants and tunnels were hit. By 31 August, Al Jazeera reported that 933 workers stationed at hydropower projects were missing and that nearly 300 had been rescued from tunnels, and Nepal’s army said the volume of debris was slowing efforts to open them.

Casualty figures rose steadily and must be read with their dates. On 27 August at least 300 people were reported dead and more than 900 missing. On 3 September Nepal’s disaster management authority reported 1,252 dead and 4,216 missing in Nepal, with a further 16 dead and 546 missing in Tibet. By 14 September the Imperial-led analysis cited more than 1,300 dead and about 5,000 missing, about 13,700 rescued, and an estimated 84,270 people affected across 17 local levels in six districts, with 15 municipalities declared crisis-hit for three months. Missing persons are not confirmed deaths. On the Tibetan side, where the flood destroyed the Gyirong port border crossing, the reported toll rose from 3 dead on 27 August to 16 by 3 September and to 43 in one later compilation, a reminder that early counts were incomplete. The same valley system produced a glacial lake outburst in July 2025, according to ICIMOD, which makes August the second serious flood there in little more than a year.

What is still being established

Several basic questions remain open: the volume of the initial collapse, the share of the flood that came from each water source, whether a temporary dam formed and released, and the final human toll. The role of climate change is addressed by the analysts as a destabilising influence on a pre-existing geological weakness, rather than as a proven cause.

Numbers in this account come from early institutional assessments and news reports, and they will change as seismic records, satellite imagery and field surveys are analysed. What is not in dispute is the sequence: a rock face failed, ice and rock became a flood, and the flood outran every human system placed in its way.

-M Venugopal

Share this:

  • Share on X (Opens in new window) X
  • Share on LinkedIn (Opens in new window) LinkedIn
  • Share on Facebook (Opens in new window) Facebook
  • Share on WhatsApp (Opens in new window) WhatsApp
  • Share on Tumblr (Opens in new window) Tumblr
  • Share on Telegram (Opens in new window) Telegram
  • Email a link to a friend (Opens in new window) Email
Tags: Himalayan Warming
Rashmi NSH

Rashmi NSH

Other Posts

Ebola Bundibugyo outbreak deaths November 2026, Africa CDC Ebola 5376 deaths, US Ebola travel attestation DRC, Ebola vaccine Bundibugyo trial, Ebola risk India, DRC Ebola outbreak 2026

Ebola Deaths Pass 5,300 as America Tightens Its Borders and Vaccines Remain Out of Reach

November 3, 2026
4
Bharat RE 2026 Modi 500 GW, India non-fossil capacity 50 percent, India renewable energy target 2036, solar module manufacturing 200 GW India, PM Surya Ghar 65 lakh homes, ISA Assembly Africa Solar Facility, battery storage India renewable

India Sets Its Sights on Another 500 GW of Clean Power After Passing the 50% Mark

November 3, 2026
4

Cyclone Murasu Makes Landfall Near Ongole as Andhra Pradesh Braces for Its Second Storm in a Week

Hyderabad’s Dr. Reddy’s Wins First US Approval for a Generic Twice-Yearly HIV-Prevention Injection

N. Balasubramanyam, Former DGP of AP, Who Rebuilt State’s Public Services on Software, Dies at 60

IMMUNOTOXICITY STUDIES FOR HUMAN PHARMACEUTICALS S8

“Our soft robotic petals capture objects of any shape”

“Achievable in Theory, Difficult in Practice”

Next Post
26 August: Reconstructing the Langtang Lirung Collapse

What Climate Change Did, and Did Not Do, at Langtang Lirung

Please login to join discussion

Subscribe to Us

Latest Articles

Translucent plastic fragments suspended in water inside a laboratory glass vessel

Not So Inert After All: Microplastics Generate Damaging Radicals Simply by Touching Water

October 15, 2026
29

BS-VII Draft: India Plans Cleaner Cars from 2029 by Policing Real-Road Emissions, Brake Dust and Battery Health

When the Pumps Stop: Telangana’s Power Shortage Is Now Undermining Its Drought Response

Telangana Regulator Sounds the Alarm on Grey-Market Weight-Loss Injections and “Research” Peptides

Teaching the World’s Most Common Plastic to Stick: An Iron Catalyst Rewrites Polyethylene’s Surface Without Weakening It

Coal Piles Shrink as Demand Soars: Power Planners Raise Coal Needs and Regulators Open the Door to Hydrogen in Household Gas

  • Advertise
  • Terms and Conditions
  • Privacy Policy
  • Refund Policy
  • Contact
For Feedback : Email Us

Copyrights © 2025 Neo Science Hub

No Result
View All Result
  • Home
  • e-Mag Archives
  • e-Learning
  • Categories
    • Healthcare & Medicine
    • Pharmaceutical & Chemical
    • Automobiles
    • Blogs
      • Anil Trigunayat
      • BOOKmarked
      • Chadha’s Corner
      • Cyber Gyan
      • Raul Over
      • Taste of Tradition
      • Vantage
    • Business Hub
    • Engineering
    • Innovations
    • Life Sciences
    • Space Technology
  • PhotoSynthesis
  • Subscribe Now
  • Contact us
  • Log In

Copyrights © 2025 Neo Science Hub

Welcome Back!

Login to your account below

Forgotten Password? Sign Up

Create New Account!

Fill the forms below to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Add New Playlist